This new construction Jordon floorplan offers a charming country feel just minutes from the lake. Located in Veneta and only 15 miles from Eugene, the community offers wine country charm, year-round recreation, and the annual Oregon Country Fair. Featuring a modern, single-level design, the home has a low-maintenance, open-concept layout perfect for entertaining and everyday living. Three bedrooms are thoughtfully arranged around the home, with a luxurious primary suite tucked away into a private back corner, complete with an en-suite bathroom and walk-in closet. The Everything’s Included® package adds AC, a refrigerator, blinds, and a washer and dryer, at no extra cost. Photos are of similar or model home so features and finishes will vary. Taxes not yet assessed. Located on Homesite 27, this home is expected to be complete in November 2025!
Listing Provided Courtesy of Mechelle Clough, Lennar Sales Corp
General Information
545867404
SingleFamilyResidence
3
DOM
3
2
1421
2025
Lane
New Construction
Elmira
Fern Ridge
Elmira
Residential
SingleFamilyResidence
Oakley Estates Lot 27
Listing Provided Courtesy of Mechelle Clough, Lennar Sales Corp
Krishna Realty data last checked: Aug 12, 2025 10:59 | Listing last modified Aug 07, 2025 20:04,
Source:
This new construction Jordon floorplan offers a charming country feel just minutes from the lake. Located in Veneta and only 15 miles from Eugene, the community offers wine country charm, year-round recreation, and the annual Oregon Country Fair. Featuring a modern, single-level design, the home has a low-maintenance, open-concept layout perfect for entertaining and everyday living. Three bedrooms are thoughtfully arranged around the home, with a luxurious primary suite tucked away into a private back corner, complete with an en-suite bathroom and walk-in closet. The Everything’s Included® package adds AC, a refrigerator, blinds, and a washer and dryer, at no extra cost. Photos are of similar or model home so features and finishes will vary. Taxes not yet assessed. Located on Homesite 27, this home is expected to be complete in November 2025!