The 2493 Tri-level Plan offers great flexible living spaces with high end finishes to include: 3cm slab concrete, gourmet kitchen package to include GAS cooking, Alder cabinets with soft-close feature and laminate flooring. The primary suite offers (2) spacious walk-in closet with wood shelving, mud-set tile shower with glass shower door, dual vanity with slab countertops. (3) Car garage, Stained cedar fencing, front & backyard landscaping and irrigation included. Camas School District! Sample Photos. Estimated completion Sept 2026.
Listing Provided Courtesy of Miranda Eversole, SEKISUI HOUSE PNW, INC.
General Information
781137269
SingleFamilyResidence
20
DOM
4
3.5
2493
2026
R-10
Clark
986065532
Lacamas Lake
Liberty
Camas
Residential
SingleFamilyResidence
GREEN MOUNTAIN ESTATES PH 5A LOT 272
Listing Provided Courtesy of Miranda Eversole, SEKISUI HOUSE PNW, INC.
Krishna Realty data last checked: Apr 14, 2026 23:57 | Listing last modified Apr 14, 2026 17:56,
Source:
Open House
Tue, Apr 14th, 11AM to 6PM
Wed, Apr 15th, 11AM to 6PM
Thu, Apr 16th, 11AM to 6PM
Download our Mobile app
Residence Information
1044
752
697
2493
PLANS
1796
1/Gas
4
3
1
3.5
Composition
3, Attached
Craftsman,TriLevel
Driveway,EVReady
3
2026
No
CementSiding, CulturedStone, LapSiding
CrawlSpace,Daylight
CrawlSpace,Daylight
ConcretePerimeter,Pi
TriplePaneWindows,Vi
Commons, Management, M
Features and Utilities
Fireplace, GreatRoom, Patio
BuiltinOven, Cooktop, Dishwasher, Disposal, ENERGYSTARQualifiedAppliances, GasAppliances, Island, Microwave
The 2493 Tri-level Plan offers great flexible living spaces with high end finishes to include: 3cm slab concrete, gourmet kitchen package to include GAS cooking, Alder cabinets with soft-close feature and laminate flooring. The primary suite offers (2) spacious walk-in closet with wood shelving, mud-set tile shower with glass shower door, dual vanity with slab countertops. (3) Car garage, Stained cedar fencing, front & backyard landscaping and irrigation included. Camas School District! Sample Photos. Estimated completion Sept 2026.